A different note: the favored serpentine route to your Salzberg will continue being closed until finally the end of the construction operate. Design do the job will start on 1 September 2025 and will previous until eventually early summer 2026. Throughout this time, the salt mine (salt mine) along with https://petere951dfg9.bleepblogs.com/profile